A customer would like to add a second HMC to an environment which consists of multiple POWER7 and POWER8 systems.
Which of the following is a requirement for both HMCs to be able to manage all the systems?
A. Both HMCs must be on the same HMC VLAN.
B. Each HMC must be on a dedicated HMC VLAN.
C. All the POWER7 systems must be at the same firmware level.
D. Both HMCs must be at the same version of HMC Code.
Answer: D
Friday, 14 December 2018
Sunday, 22 July 2018
IBM C9010-262 Question Answer
A client with a single node E870 would like to attach two I/O expansion drawers to provide more PCI slots. What is the maximum number of full height PCI slots available with this configuration?
A. 32
B. 30
C. 24
D. 26
Answer: C
A customer has a Power System with multiple IBM i partitions and needs to share a TS2270 amongst them. What is the best method to share the drive and keep costs low and take advantage of their IBM i skill set?
A. Add the SAS adapter to each partition to connect to the TS2270.
B. Add a VIOS partition for virtual tape.
C. Create NPIV connections to virtualize the TS2270.
D. Create vSCSI connections to virtualize the TS2270.
Answer: D
A. 32
B. 30
C. 24
D. 26
Answer: C
A customer has a Power System with multiple IBM i partitions and needs to share a TS2270 amongst them. What is the best method to share the drive and keep costs low and take advantage of their IBM i skill set?
A. Add the SAS adapter to each partition to connect to the TS2270.
B. Add a VIOS partition for virtual tape.
C. Create NPIV connections to virtualize the TS2270.
D. Create vSCSI connections to virtualize the TS2270.
Answer: D
Wednesday, 28 February 2018
IBM C9010-262 Question Answer
A customer would like to implement an E880 for high availability.
can the customer reduce the cost of IBM i and AIX licenses for the E880?
A. Enter the IBM software keys from one of the production systems within 30 days of the failover.
B. Use DLPAR to add already-activated cores to partitions only when needed.
C. Purchase the system as Capacity BackUp (CBU )
D. Use Power HA System Minor to transfer the licenses when needed
Answer: C
What is the advantage of virtualization with PowerVM over VMware ESX?
A. Only PowerVM can support Linux.
B. Only PowerVM can dynamic ally deallocate processors and memory.
C. Only PowerVM can allocate processors dynamically.
D. Only PowerVM can share network resources.
Answer: C
can the customer reduce the cost of IBM i and AIX licenses for the E880?
A. Enter the IBM software keys from one of the production systems within 30 days of the failover.
B. Use DLPAR to add already-activated cores to partitions only when needed.
C. Purchase the system as Capacity BackUp (CBU )
D. Use Power HA System Minor to transfer the licenses when needed
Answer: C
What is the advantage of virtualization with PowerVM over VMware ESX?
A. Only PowerVM can support Linux.
B. Only PowerVM can dynamic ally deallocate processors and memory.
C. Only PowerVM can allocate processors dynamically.
D. Only PowerVM can share network resources.
Answer: C
Subscribe to:
Posts (Atom)